SKY RIDGE EXECUTIVES
About Project
CEPAC conducted a comprehensive Traffic Impact Study (TIS) for the SKY RIDGE EXECUTIVES Project located in the Sheraton area, East Cairo. The study evaluated the impact of the development on the surrounding transportation network through detailed traffic analysis, parking assessment, trip generation and distribution, and operational evaluation of nearby intersections and corridors.
Services We Offered
- Traffic Impact Study (TIS)
- Traffic Surveys & Traffic Counts
- Parking Demand Assessment
- Trip Generation & Distribution
- Internal Circulation Analysis
- Access & Ramp Evaluation
- Intersection Capacity Assessment
- Traffic Forecasting
- Transportation Network Evaluation
- Microsimulation Modeling
- Traffic Improvement Recommendations
Project Location
Sheraton Area – East Cairo, Egypt
Key Study Elements
The study included:
- Existing and future traffic condition assessments
- Peak hour traffic analysis
- Vehicle classification surveys
- Evaluation of project gates and ramps
- Parking demand and supply assessment
- Road network coding and traffic assignment
- VISSIM microsimulation for surrounding intersections
- Future year operational analysis for 2026 and 2030
- Engineering mitigation and traffic improvement proposals
Software & Tools
PTV VISSIM
PTV VISUM
Google Earth
Traffic Modeling & Simulation Tools
Project Information
Local Projects
Sheraton Area – East Cairo, Egypt
11 services
Related Projects
Project Gallery
All images from SKY RIDGE EXECUTIVES